Available information
The available records contain the project name and reference photographs.
Project name and reference photographs are available; detailed scope and technical methods are not yet documented.
The available records contain the project name and reference photographs.

Foundation strengthening, integrated tilt correction and dynamic monitoring addressed settlement, tilt and cracks.
Explore ↗
An old office building was to become a museum, requiring larger internal spaces while retaining its historic appearance.
Explore ↗
Foundation strengthening and lifting addressed differential settlement, tilt and wall cracks.
Explore ↗Foundation strengthening addresses capacity and deformation of the ground and foundations; tilt correction adjusts a building's inclination. They may be coordinated, but settlement stabilization, tilt correction and structural strengthening have different objectives.
Explore ↗Selection considers structure, foundations, soil, the cause of tilt, access and effects on surroundings. Cases explain technical approaches but cannot replace project-specific analysis and design.
Explore ↗Duration depends on available information, investigation and design requirements, scope and site conditions. The time for one operation in another case is not a whole-project schedule.
Explore ↗Tell us about your project and explore the next step.