Client requirement
Foundation strengthening and lifting addressed differential settlement, tilt and wall cracks.
Engineering challenge
The tower and garage were structurally connected, requiring attention to additional forces from differential settlement and construction-stage response.
Technical approach
High-capacity anchor-reaction jacked grouted steel pipe piles strengthened the foundation. Following structural separation at selected lower-level locations, synchronized jacking was controlled using multi-direction displacement and stress monitoring.
Project value
The work connected foundation treatment, structural separation, synchronized lifting and monitoring-based tilt correction.