Bridge maintenance and strengthening based on inspection findings, structural characteristics and construction constraints.
Useful initial information includes bridge design and as-built documents, previous inspection and maintenance records, traffic arrangements and construction access.
A project normally proceeds through information review, engineering assessment, design and implementation, monitoring and delivery. The actual scope is defined by the contract and technical scheme.
What to establish before discussing a project
Describe the existing condition, the problem to be resolved, intended use and construction constraints. Drawings, investigation results and site information then inform the engineering approach. Scope, implementation conditions and deliverables are defined in the project agreement.
Information to prepare
- Bridge design and as-built records
- Inspection and maintenance history
- Traffic and construction constraints
Project pathway
- Information gathering and requirements discussion
- Site assessment and technical options
- Scheme design and construction planning
- Monitoring and handover