- Location
- Angola
- Recorded area
- 12,000 m²
Client requirement
Tilt correction and foundation strengthening addressed differential settlement, building tilt and local cracks.
Engineering challenge
Force transfer between the existing structure and new foundations required coordination, with dynamic feedback informing adjustments to the flexible building.
Technical approach
Integrated tilt correction, preloaded sealing of anchor-reaction jacked piles and real-time monitoring supported foundation work and construction control.
Project value
The project demonstrates overseas restoration experience combining foundations, tilt correction and monitoring. Its duration, deformation recovery and cost outcomes are project-specific.