Client requirement
Settlement stabilization and lifting addressed differential settlement of coal-handling buildings and equipment foundations.
Engineering challenge
Numerous machines and restricted access constrained the work. Records specifically describe concurrent construction and production, with temporary conveyor supports adjusted during lifting.
Technical approach
Working space beneath existing pile caps enabled jacked steel pipe piling. Synchronized lifting, vertical load and stress-strain monitoring informed real-time adjustments, followed by preloaded pile-head sealing.
Project value and operational arrangements
The case demonstrates coordination of production and strengthening under these particular conditions. Feasibility of continued operation requires assessment for each individual factory.