Client requirement
A historic building was relocated as a whole and subsequently strengthened.
Engineering challenge
Assessment of the brick-and-timber structure identified safety issues requiring temporary strengthening before movement.
Technical approach
Concrete-beam underpinning and a rolling system connected pre-relocation temporary strengthening, movement and post-relocation strengthening.
Project value
The project illustrates treatment of the original structure before supporting and relocating a historic building.