Client requirement
Functional changes required increased floor-to-floor height and load capacity through floor lifting and strengthening.
Engineering challenge
The extensive lifting area required coordinated displacement and control of changing structural forces.
Technical approach
Building lifting devices, PLC synchronized lifting controls and intelligent monitoring supported analysis of lifting data and construction adjustments.
Project value
The work combined floor lifting, synchronized control and overall strengthening for healthcare-building renewal.