Client requirement
A change in use required an increased first-floor height in the central podium, achieved through whole-floor lifting.
Engineering challenge
Numerous lifting points and substantial loads required coordination of vertical movement and changing structural forces.
Technical approach
Building lifting devices, strain monitoring and magnetic-scale vertical displacement monitoring tracked the synchronized lifting operation.
Project value
The work combined multi-point lifting with displacement and strain monitoring to adjust an existing building's storey height.