News

Deqing Logistics Warehouse Strengthening Design Passes Expert Review

Strengthening studies and construction drawings respond to warehouse structural conditions.

On 20 April 2021, the company's structural strengthening drawings for Warehouse 1 at Deqing Logistics Base passed expert review.

Design considered the existing structure, foundations and use requirements. Review addressed both the scheme and detailed connections.

This is a design-stage milestone, distinct from completed construction or acceptance.

Deqing Logistics Warehouse Strengthening Design Passes Expert Review — 1
Deqing Logistics Warehouse Strengthening Design Passes Expert Review — 2
LET’S BUILD THE NEXT CHAPTER

Every building deserves thoughtful engineering.

Tell us about your project and explore the next step.

Discuss your project ↗