On 20 April 2021, the company's structural strengthening drawings for Warehouse 1 at Deqing Logistics Base passed expert review.
Design considered the existing structure, foundations and use requirements. Review addressed both the scheme and detailed connections.
This is a design-stage milestone, distinct from completed construction or acceptance.



