Industrial & Commercial Retrofit During Operations

Steel Roof Strengthening at Jiangsu Xingda Steel Tyre Cord Factory

Steel beams and roof bracing were strengthened to accommodate additional roof ventilators.

Location
Xinghua, Jiangsu

Client requirement

Additional roof ventilators required strengthening of the existing factory's steel beams and bracing system.

Engineering challenge

The altered use required compatibility with the existing steel load path and control of cable stressing and anchorage.

Technical approach

Structural calculations and strength and serviceability checks preceded staged stressing and anchorage to achieve the specified cable forces.

Project value and operational arrangements

The case demonstrates steel strengthening for altered industrial use. Available records do not confirm whether production continued throughout construction.

RELATED PROJECTS

Explore related work.

PROJECT QUESTIONS

Questions related to this work.

LET’S BUILD THE NEXT CHAPTER

Every building deserves thoughtful engineering.

Tell us about your project and explore the next step.

Discuss your project ↗