- Location
- Nanjing
- Recorded area
- 40,000 m²
Documented scope
Foundation strengthening covered Buildings A, B and H in Phase I.
Foundation strengthening covered Buildings A, B and H in Phase I.
Foundation strengthening covered Buildings A, B and H in Phase I.
Cracks have many possible causes. A photograph alone cannot diagnose foundation settlement. Crack location, shape, progression, structural details and settlement observations must be assessed together.
Explore ↗Pile number alone does not determine effectiveness. Layout, bearing conditions, connections and interaction between new and existing foundations all require design based on investigation and calculation.
Explore ↗Monitoring records deformation and construction response to inform adjustments and evaluation. The scheme must define what is monitored, how often and the required control criteria.
Explore ↗Tell us about your project and explore the next step.